Aerial view of commercial foundation pour with rebar grid under site lighting
FORGE CONSTRUCTION — EST. 2003 — LICENSED GC · 50 STATES

Your Last Contractor
Promised.We Document.

Every number on this page is pulled from project closeout reports, third-party EMR audits, and certified payroll records. No marketing copy. No rounding.

0.0%

Projects Delivered On Schedule

FY2022–2025, 47 projects

+0.0%

Avg. Cost Variance from Bid

Below 3.2% industry median

0.00

TRIR per 200,000 Work Hours

vs. 3.1 industry average

Scroll to review performance record
PERFORMANCE RECORD — 6 PROCUREMENT METRICS

Industry Average
vs. Our Verified Record

Six metrics procurement scoring rubrics weight most heavily. Every figure sourced from third-party documentation — not our marketing team.

Metric
▶ FORGE CONSTRUCTION
Industry Average
Source

Single Project Bonding Capacity

Surety bond limit per project

$85MVERIFIED ✓
$22MAVG

Travelers Surety, 2025 cert.

EMR Safety Rating

Experience Modification Rate (lower = safer)

0.71VERIFIED ✓
1.00AVG

NCCI verified, 2025

Average RFI Response Time

From submission to documented response

18 hrsVERIFIED ✓
72 hrsAVG

Procore analytics, 47 projects

Change-Order Frequency

Avg. change orders per $1M contract value

0.8VERIFIED ✓
3.4AVG

AGC industry benchmark, 2024

Schedule Adherence Rate

Projects completing within contracted duration

94.3%VERIFIED ✓
62.0%AVG

Project closeout docs, FY2022–2025

Warranty Callback Rate

Callbacks per 100 completed projects, 12-mo warranty

4.2VERIFIED ✓
18.7AVG

Client survey, 41 respondents

Industry averages sourced from AGC 2024 Construction Industry Annual Report, NCCI national EMR baseline, and ENR benchmark data. Forge figures derived from certified project closeout documentation available upon request.

PROJECT RECORD — 3 REPRESENTATIVE ENGAGEMENTS

Aggregate Proof
Becomes Specific Evidence.

Bid vs. final cost. Projected timeline vs. actual delivery. Coordination complexity by the numbers.

COMMERCIAL OFFICE

Meridian Corporate Campus — Phase II

Austin, TX · 218,000 SF · Completed 2024

Contract Value

$34.2M→$34.7M+1.5%

Timeline

22 months→21.5 months15 days early

31

Subs

214

RFIs

27

Change Orders

LEED Gold certification achieved without scope additions. All 214 RFIs resolved within 18-hour average.

MUNICIPAL INFRASTRUCTURE

Riverside Water Treatment Expansion

Denver, CO · 94,000 SF · Completed 2023

Contract Value

$18.9M→$19.2M+1.6%

Timeline

18 months→18 monthsOn day

19

Subs

142

RFIs

11

Change Orders

Municipal procurement required certified payroll compliance. Zero violations across 19 months of active construction.

INDUSTRIAL DISTRIBUTION

Summit Logistics Hub — Building C

Columbus, OH · 412,000 SF · Completed 2025

Contract Value

$52.1M→$53.1M+1.9%

Timeline

16 months→15.5 months14 days early

44

Subs

387

RFIs

48

Change Orders

44 subcontractors coordinated across concurrent structural, MEP, and site work. EMR held at 0.68 throughout.

PREQUALIFICATION PACKET — 8 DOCUMENTS

Everything Your Scoring
Rubric Asks For.

Most procurement evaluations require the same eight documents. We package them in one PDF so your team spends evaluation time comparing data — not chasing paperwork.

Certificate of Insurance — $100M aggregate
Current EMR letter from NCCI (0.71)
Bonding capacity letter — $85M single / $200M aggregate
Safety program summary + TRIR history (5-year)
List of comparable projects with owner references
Financial statements (most recent 2 fiscal years)
Key personnel resumes + project experience
Subcontractor qualification standards

Download Prequalification Packet

PDF · 2.4MB · No spam, no follow-up calls

Used only to deliver the document. Not added to any list.

BID REQUEST — RESPONSE WITHIN 48 HOURS

Request Our Bid Package

Four fields. We ask what we need to determine whether the project is a fit — not to build a sales database.

48-hour response
No unsolicited follow-up
Bid includes full scope breakdown